Skip to content

SR&ED Guides

Eligible SR&ED expenses: what you can claim.

An SR&ED claim has two halves: the technical story and the costs. This guide covers the costs, the four categories most claims are built on, and the choices that change how much you get back.

How SR&ED costs work

The CRA calls the costs you can claim allowable expenditures: the current and capital expenditures you incurred carrying out SR&ED work in the tax year. The key word is link. Every dollar has to be connected to eligible work, so the cost side of a claim always follows the technical side. A strong technical write-up with weak costing leaves money on the table; generous costing with no technical support is what CRA reviews are designed to catch.

From the allowable expenditures, a further calculation produces qualified expenditures, the amount on which the investment tax credit (ITC) is earned. For example, only 80% of an arm’s length contract payment becomes a qualified expenditure for ITC purposes, and government or non-government assistance reduces the pool.

The four main cost categories

RDC builds most claims from the same four categories, each with its own guide:

  • Salaries and wages: pay for employees directly engaged in the SR&ED work, usually the largest part of a claim.
  • Contractors: payments to outside firms or people who perform SR&ED in Canada on your behalf.
  • Materials: materials consumed or transformed in the SR&ED work, such as test batches, prototype parts and trial runs.
  • Overhead: either claimed line by line under the traditional method, or replaced by a calculated amount under the proxy method.

The first decision: traditional or proxy

Every claimant must choose, for each tax year, the traditional method or the proxy method. The CRA says you cannot change the method after you submit the claim, and if you do not choose, the CRA will apply one. Under the traditional method you identify actual overhead and other expenditures. Under the proxy method you skip that work and instead add a prescribed proxy amount (PPA), which since 2014 is 55% of a salary base, subject to a cap. The choice affects salaries, materials and lease costs as well as overhead, so it is worth modelling both. Our overhead and proxy guide walks through it.

Capital expenditures and leases are back

From 2014, capital expenditures stopped qualifying for SR&ED. That changed with recent federal measures. The CRA now says SR&ED capital expenditures made after December 15, 2024 qualify again, and eligible lease costs for equipment used in SR&ED in Canada can be claimed when incurred after December 15, 2024. A capital expenditure for SR&ED is the cost of new or used depreciable property you intend to use for SR&ED, for example where more than 90% of its value will be consumed in SR&ED in Canada. Do not also claim the same cost on Schedule 8 (capital cost allowance). For CCPCs, the ITC earned on capital expenditures is 40% refundable, compared with 100% on current expenditures up to the expenditure limit.

Costs that do not qualify

  • Costs of excluded work: market research, sales promotion, routine quality control, commercial production and style changes.
  • Work done outside Canada, apart from limited exceptions for salaries.
  • Materials bought for SR&ED but not yet used. You claim them in the year they are consumed or transformed.
  • Amounts covered by assistance or contract payments, which reduce what you can claim.

The records that support your costs

Payroll registers and time records (or a defensible allocation of each person’s time to each project), contractor agreements and invoices, material purchase invoices with a trail to the trials that used them, and the general ledger. RDC’s costing team, which includes Certified Accountants, reconciles these to your financial statements so the claim matches what your accountant files.

Examples by industry

The categories are the same everywhere, but the detail changes by sector. A manufacturer’s claim may be heavy on trial runs and machine time; a software claim is mostly developer salaries. See how each applies to manufacturing, software and IT, food and beverage, environmental technologies and chemical products.

FAQ

Common questions.

What expenses qualify for SR&ED?

Mainly salaries and wages of employees directly engaged in the work, contracts for SR&ED performed in Canada on your behalf, materials consumed or transformed, overhead (traditional method) or the prescribed proxy amount (proxy method), and, from December 16, 2024, eligible capital and lease costs.

Can I switch between the traditional and proxy method?

You choose a method for each tax year, but the CRA says you cannot change it after the claim is submitted.

Are capital expenditures eligible for SR&ED again?

Yes. According to the CRA, SR&ED capital expenditures made after December 15, 2024 qualify, and the ITC on them is 40% refundable for CCPCs up to the expenditure limit.

Why is only part of a contract payment claimed?

Since 2013, 80% of an arm’s length SR&ED contract payment is a qualified expenditure for investment tax credit purposes.

What’s the hold up? Let’s Claim Success!

Contact us anytime to discuss your company’s SR&ED projects and refund eligibility. We would be pleased to provide you with a FREE initial SR&ED Consultation of these project(s) and give you an SR&ED refund estimate based on your expenditures.